Review of Systemization of the Tooele Chemical Agent Disposal Facility (Paperback)
  • Review of Systemization of the Tooele Chemical Agent Disposal Facility (Paperback)
zoom
£33.00
Paperback 134 Pages / Published: 19/04/1996
  • We can order this

Usually dispatched within 3 weeks

  • This item has been added to your basket
In 1993, at Tooele Army Depot, Utah, the Army completed construction of the Tooele Chemical Agent Disposal Facility (TOCDF), the first complete facility for destruction of lethal unitary chemical agents and munitions to be built in the continental United States. The TOCDF will employ the Army's baseline incineration system to destroy the depot's increment of the nation's aging unitary chemical stockpile. This book assesses Army changes and improvements to the TOCDF in response to recommendations contained in earlier reports of the committee. It assesses aspects of the facility's readiness for safe agent handling and destruction operations, its agent monitoring system, and its site specific risk assessment.

Publisher: National Academies Press
ISBN: 9780309054867
Number of pages: 134
Weight: 363 g
Dimensions: 279 x 216 x 13 mm

You may also be interested in...

London's Sewers
Added to basket
Junkyard Planet
Added to basket
£12.99
Paperback
Sewers for Adoption
Added to basket
WRC
£35.00
Hardback
A Journey in the Future of Water
Added to basket
Water Resources Engineering
Added to basket
Water 4.0
Added to basket
£12.99
Paperback
Urban Drainage, Third Edition
Added to basket
Where Does The Poo Go...
Added to basket
Water Regulations Guide
Added to basket
The Great Stink of London
Added to basket

Reviews

Please sign in to write a review

Your review has been submitted successfully.