About Time: Delay Analysis in Construction (Paperback)
  • About Time: Delay Analysis in Construction (Paperback)
zoom

About Time: Delay Analysis in Construction (Paperback)

(author), (author)
£47.50
Paperback Published: 01/04/2006
  • Not available

This product is currently unavailable.

  • This item has been added to your basket
Over the years delays on construction projects has prompted a steady flow of reports, academic analyses and court cases, but these have provided very little straightforward practical advice to construction professionals on how to evaluate delays. Everyone from architects, engineers and surveyors through to contractors, expert witnesses and lawyers connected to the construction industry often have to face the difficult task of preparing or assessing a delay claim but few have received any significant training in how to go about the task. "About Time: Delay Analysis in the Construction Industry" tackles the difficulties of delay analysis head on and as a result, it strips away the mystique surrounding the subject of delay analysis, and reveals the limitations of the various methods of delay analysis commonly used.

Publisher: RICS Books
ISBN: 9781842192474
Dimensions: 250 x 150 x 9 mm

You may also be interested in...

Structural Engineering for Architects
Added to basket
Brunel's Kingdom
Added to basket
The Briggers
Added to basket
£16.99
Paperback
Charleston Saved 1979-1989
Added to basket
Foundations of Engineering Geology
Added to basket
Design of Structural Elements
Added to basket
Building Construction Illustrated
Added to basket
Brunel
Added to basket
£9.99
Paperback
Structures
Added to basket
£12.99
Paperback

Reviews

Please sign in to write a review

Your review has been submitted successfully.